100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Development application lodged for town centre with 14,800sqm of retail space

Do you have a news tip? Click here to send to our news team.

Council keeps fluoride flowing after analysing risks and costs

Noosa Council says it has no plans to remove fluoride from the local water supply. A mayoral minute from Frank Wilkie outlined his stance, which More

Man strangled wife believing she stole his ID cards

A man strangled his wife at a hotel on Valentine's Day while suffering a drug-induced psychosis that sparked paranoia she had stolen his driver's More

Water safety a priority during warm long weekend

Beachgoers and boaties have been urged to be vigilant during a warm and busy Australia Day long weekend. Thousands of people are expected to flock More

Jane Stephens: working at making great friends

Children are actively encouraged to make friends. They are pushed together with those close in age at family gatherings. Parents drive children to play dates, More

‘A rare gem’: tightly held waterfront home ‘not to miss’

An “immaculate” home perched on the Mooloolah River with an over-water deck is being described as a “rare gem”. With 18 metres of water frontage, More

‘Run out of money’: homeless charity forced to fold

A charity that provided temporarily relief to those impacted by the continuing housing crisis has been forced to wind up. Sleepbus, which arrived on the Sunshine More

An application has been submitted to develop the first stage of a long-awaited town centre that will include a mix of supermarkets, retail, dining, entertainment and healthcare services.

Stage 1 of the Aura Town Centre, part of the Caloundra South Priority Development Area, will comprise 14,800sqm of retail floor space and 1345sqm of commercial floor space.

It will be spread over two storeys and reach 10.8 metres high.

The total gross floor area will span 17,250sqm, comprising 15,470sqm on the ground floor and 1780sqm on level one. By comparison, Sunshine Plaza has a gross lettable area of just under 107,000sqm.

A total of 668 car parking spaces will be provided, with 403 in a basement and 265 on the ground floor.

The subject site on Aura Boulevard at Bells Creek spans 3.87 hectares, but is part of a 106-hectare lot that is owned by Stockland.

An aerial view of the proposed Aura Town Centre. Picture: Buchan

The application was submitted to Economic Development Queensland by Urbis on behalf of Stockland on December 20, with EDQ acknowledging receipt of the application on January 20.

A Stockland spokesperson said the developer was keen to get moving on the project.

“We’ve started the exciting next steps to bring the Aura Retail Town Centre to our growing Aura community,” they said.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.auYou must include your name and suburb.

“We understand the importance of the town centre to our residents, which will provide a high-quality retail, dining and entertainment precinct in the heart of Aura.

“Delivery of Stage 1 of the Aura Retail Town Centre is dependent on approval timelines and we’ll keep the community updated as this progresses.”

The planning report by Urbis provides further background to the application.

“An existing approval for a Plan of Development (including the site) identifies specific development outcomes for the site,” it says.

The location of the town centre within the broader Aura development.

“Since the Plan of Development was issued, the retail component of the Town Centre Core has undergone refinements in response to market, developer and construction requirements.

“As such, this application is sought as a new development application (as opposed to an application pursuant to the Plan of Development).”

The Aura Town Centre Plan of Development, approved by EDQ in 2016, involves 90,000sqm of retail, 45,000sqm of commercial, a potential future university, a retirement living site for up to 250 dwellings, about 2700 standard residential dwellings, up to 10 storeys of permitted building heights in key areas and about 310 hectares of conservation land.

“Architecturally designed to foster a vibrant community atmosphere, this pedestrianised space has a strong emphasis on creating a welcoming and dynamic environment for residents and visitors,” the report says.

“The design incorporates a variety of tenancy and commercial offerings, ensuring a diverse mix of shops, services and dining options that cater to a wide range of needs and preferences.

“The Aura Town Centre is strategically integrated with the broader areas of the development, including People’s Place to the north (which includes the Comiskey Group’s Aura Hotel).

“This integration ensures seamless connectivity and flow between different parts of the community, creating a cohesive and well-connected urban fabric.”

The development would also feature an “active frontage” along the Main Street.

“Main Street will be a privately owned and managed north-south corridor, meticulously designed to balance the needs of both pedestrians and vehicles,” the report says.

An impression of how the centre could look. Picture: Buchan

“By implementing a low-speed environment, the street prioritises pedestrian safety, encouraging foot traffic and facilitating safe crossings.”

The proposed Stage 1 development would be delivered in two sub-stages. Stage 1A would deliver the ground-level retail tenancies, basement car park and 198 temporary ground-level car parking spaces, while Stage 1B works would include the level-one tenancies.

The Stockland website provides more details on the next steps to deliver the town centre.

“Site preparation works are underway, including earthworks for basement construction and to level the site where required to ensure it’s ready for infrastructure development,” it says.

Another aspect of the proposed Aura Town Centre. Picture: Buchan

“Civil works are also underway, including the creation of essential road and utility networks to connect the town centre to the wider community.

“EDQ will be assessing our DA, and we will be working with them to achieve the required approvals throughout 2025.

“Following the DA approval, detailed design will be completed alongside leasing so that the centre suits the needs of tenants and customers.

“Once detailed design is finalised and leasing activities are progressing, construction of the centre can begin.”

Subscribe to SCN’s free daily news email

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share