100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Preliminary studies conducted for replacement of decades-old seawall

Do you have a news tip? Click here to send to our news team.

Man drowns out of sight between two patrols

The Sunshine Coast's chief lifeguard has renewed a call for beachgoers to swim between the flags after a man drowned in a rip. Trent Robinson More

Tide study says passage turning to open coastline

A storm tide study by an engineering firm specialising in extreme weather has recommended that areas on the Sunshine Coast be identified for protection More

Work to start on $43m ‘boutique’ hub

Building is set to begin on the latest “boutique” development along a road that is fast becoming a multi-residential hub. In May, Noosa Council granted More

Beachfront home and pool recognised as best in state

A stunning beachside house and pool have been recognised with major building awards. Hamptons Homes Australia's 'Sunshine Beach' property at Sunshine Beach was acknowledged as More

‘Our son’s legacy at work’: Walk for Daniel marks 20 years

A banner once used on a hot-air balloon to help in the search for Daniel Morcombe was the focal point during an event to More

Final say: candidates outline plans to engage with public

After months of build-up the state election campaign frenzy reaches its climax tomorrow, with Queenslanders heading to the polls. To help voters decide, Sunshine Coast More

A beaten seawall along one of the region’s most visited beaches is set to be renewed.

Worn down by the elements since about 1970, the wall at Kings Beach is expected to be replaced with more durable materials.

Sunshine Coast Council has conducted preliminary studies to rebuild the structure and to provide a wider coastal pathway, although design details are yet to be finalised.

There are also plans to replace the seawalls at Mooloolaba and Moffatt Beach, and to restore the seawall at Golden Beach.

An overhauled seawall at Kings Beach could complement the building of a replacement $4 million surf lifesaving facility on the foreshore.

A council spokesperson said the current wall was worn and it would need to be replaced.

“The Coastal Hazard Adaptation Strategy identifies the existing seawall infrastructure at Kings Beach is ageing,” they said.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

“The current seawall was placed along the foreshore around 1970.

“It was not constructed to any engineering standards.

Kings Beach is a go-to destination for locals and tourists. The seawall can be seen at the top of the beach. Picture: Shutterstock

“The strategy, from present day to 2041, is to continue to mitigate coastal hazard risk and prepare for additional hazard mitigation in some areas in the future.

“Council has completed a number of preliminary background studies to support future seawall and coastal pathway construction.”

There are few specifics at this stage, but the spokesperson said a replacement wall would be significantly more robust.

“No design details have been finalised, however durable materials to withstand harsh coastal conditions would be used.

“Any future seawall would adhere to modern coastal engineering standards.

“It would be designed for the specific Kings Beach coastal conditions to keep our community safe, while balancing the protection of the park and health of our beaches and coastline.

“The wall height will be determined through coastal modelling, engineering standards and any requirements behind the wall.

“This will all be considered through the design process.

“We will not know construction costs or timeframes until further design progresses.”

The current seawall is about 380m long. It’s not yet known how much of that would be replaced. Sections of it are almost completely covered by sand.

The council spokesperson said the design of the seawall and the design of the surf facility “must align to complement each other”.

“However, the construction of each is independent,” they said.

The long stretch of Kings Beach, neat the Caloundra CBD. Picture: Shutterstock

“Any new seawall will be located eastward (beachside) of the new surf facility and is anticipated to incorporate a wider coastal pathway.

“Council is investigating a range of construction methods to ensure the new surf lifesaving facility can be built independently of any future upgrades to the seawall and coastal pathway.

“(But) the height and configuration of a potential future Kings Beach seawall, which meets the requirements of the Coastal Hazard Adaptation Strategy, was one element council needed to resolve before the tender process started for the new surf life saving facility.

“We anticipate that the design consultancy services tender for the Kings Beach Surf Life Saving facility will be released in the coming months.”

Subscribe to our FREE daily news feed. All it requires is your name and email at the bottom of this article.

Subscribe to SCN’s free daily news email

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share