100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Pedestrians won't have to risk walking along narrow road shoulder any more

Do you have a news tip? Click here to send to our news team.

Stadium upgrade set to start: Coast ‘on track’ for Games

Work is about to start on a major redevelopment of the region's premier sports facility. Preliminary works for the $148 million Sunshine Coast Stadium upgrade More

Home with lofty shipping container pool headlines auction event

A hillside home with an elevated shipping container pool is set to make a splash at a huge auction event on the Sunshine Coast. No.10 More

Man charged after woman allegedly held against her will

A man has been charged after he allegedly held a woman against her will and assaulted another man. It will be alleged that about 6.30pm More

Fresh new look for popular seaside park

Significant upgrades are being made to a popular beachside park. The first stage of works is complete, and the second stage is about to start, More

Community garden takes root in growing suburb

A community garden has sprouted in one of the Sunshine Coast's fastest-growing areas, and scores of locals are ready to dig in and help More

Photo of the day: beneath the waves

A diver and turtle off Old Woman Island, taken by David Cook from @niftyshotzz. If you have a photo of the day offering, email photo@sunshinecoastnews.com.au More.

Calls for a pedestrian bridge near a narrow road crossing have been answered, with a multimillion-dollar funding announcement.

A $6 million boost will be used to deliver a new pedestrian bridge, pathway and boardwalk at Eumundi.

People have been walking a virtual tightrope across the road bridge on Eumundi-Noosa Road, to go between the township and residential areas to the east. There is less than a metre to passing traffic.

The new pedestrian bridge will run next to the existing road bridge.

The funds will be provided by the federal and state governments’ Road Safety Program.

The Department of Transport and Main Roads partnered with Sunshine Coast Council to develop the design for the pedestrian bridge.

The road bridge, obscured by trees, at Eumundi. Picture: Nearmap

TMR and the council will continue to collaborate through the construction phase, which is expected to take up to six months to complete, weather and construction conditions permitting. A start date is yet to be confirmed.

TMR confirmed locals had been calling for a pedestrian bridge, to avoid walking and riding along the narrow shoulder on the road bridge.

TMR North Coast deputy regional director Justin Valks said the additions would provide “safety and accessibility benefits for the Eumundi community”.

“Once constructed, the local community, including school-aged children, will be able to use the new pedestrian bridge to walk safely across North Maroochy River on Eumundi-Noosa Road into the township of Eumundi,” he said.

Where the bridge and pathway will be installed.

“The project will deliver a new pedestrian walkway and bridge over the North Maroochy River, running from Seib Road, to integrate with the existing footpath near the Eumundi rail crossing.”

The aerial imagery in this story is from Australian location intelligence company Nearmap. The company provides government organisations, architectural, construction and engineering firms, and other companies, with easy, instant access to high-resolution aerial imagery, city-scale 3D content, artificial intelligence data sets, and geospatial tools to assist with urban planning, monitoring and development projects in Australia, New Zealand and North America.

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Subscribe to SCN’s free daily news email

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share