100% Locally Owned, Independent and Free

100% Locally Owned, Independent and Free

Foreshore park upgrade includes reconstruction of section of revetment wall

Do you have a news tip? Click here to send to our news team.

Coast’s ‘most wanted’ invasive species list released

A cactus native to South America, foxes and feral deer are among the targeted species in the region's new biosecurity plan. Residents can now explore More

Search underway for independent to contest federal seat

A community group has ramped up its search for an independent candidate to run for federal parliament next year. Fairfax Matters is calling for expressions More

Photo of the day: aquatic paradise

“A great start to the day on Dunethin Lake – fish jumping, pelicans patrolling and Mount Ninderry keeping watch,” writes Alison Sayce. If you have a More

Leading imaging clinic expands with state-of-the-art facility

A leading medical imaging company has opened its newest state-of-the-art facility, marking a new era for radiology in the region. Sunshine Coast Radiology (SCR) has More

Ferry service starts with scenic spot added to route at 11th hour

The Sunshine Coast's first regular passenger ferry service launches today, with a fourth stop added to the route at late notice. The 52-passenger Mooloolaba Ferry More

Coast swelters amid ‘unusual’ heatwave

Parts of the Sunshine Coast are being walloped by hot conditions in a precursor to summer. Temperatures rose across the region on Wednesday, amid a More

One of the Sunshine Coast’s most used parks has been improved with a range of works, including the renewal of a revetment wall.

Charles Clarke Park, beside the Mooloolah River, has received $2.5 million of upgrades, including better protection from coastal hazards and the installation of LED lighting and smart irrigation.

Sunshine Coast councillor Joe Natoli said the space, which offers views of the marina at the Wharf Mooloolaba, needed improvements.

“The park was supported by an ageing revetment wall which was starting to fail in some sections and no longer effective,” he said.

“We have reconstructed 184m of the existing wall at this busy area, using more than 3000 tonnes of local quarry rock.

“The renewed wall will protect the parkland and footpath from coastal hazards now and into the future, with a 50-year design life.

The reconstructed 184m of revetment wall, using more than 3000 tonnes of local quarry rock.

“It adheres to modern coastal engineering standards, designed for the specific coastal conditions at this location to keep our community safe, and protect the park and foreshore.

“It’s great news for all those who use the park and enjoy our beautiful coastline, as we have also rebuilt the coastal path in this area with improved and wider pathways.

“The new coastal path is 3.6m wide, making it even better for our community, with enough space for pedestrians and riders to pass each other comfortably.

“It is part of the 73km Sunshine Coast Coastal Pathway that stretches from Bells Creek in the south to Coolum in the north.”

Council also installed an irrigation system that monitors the weather and adjusts water usage accordingly, to optimise water delivery within the park.

“The new irrigation system will provide sustainable and efficient water management and care for our environment through water conservation,” Cr Natoli said.

“It enables us to remotely manage and optimise water consumption at this very popular park while responding to the ever changing environmental and weather conditions.

“It supports up to 50 per cent in water savings as we provide high quality recreation and landscape solutions for our community.”

There’s also an LED lighting system that will be monitored and controlled remotely to enable more efficient maintenance.

“The new LED lighting system will be managed remotely to reduce brightness late at night which is better for dark sky and wildlife,” he said.

“LED lights are far more efficient than traditional lighting technology and are also about five times cheaper to run.

“New, smart switchboards now include an events section, where power can be accessed for use in events in the park, making it easier for public use.”

A new 3.6m wide path at Charles Clarke Park.

The park also received a facelift, with 184m of long-lasting, polished stainless-steel handrails and balustrades to keep cyclists and pedestrians safe.

“The marine-grade polished stainless-steel is in keeping with the balustrade design in other locations along the Mooloolaba foreshore and the aesthetic of polished metal on the yachts and watercraft in the marina,” Cr Natoli said.

“With additional trees planted and with new park furniture, we’ve made the park even more beautiful for our community and visitors to enjoy.

“These upgrades at Charles Clarke Park are a great example of how we are working with our community to nurture and enhance our environment and quality of life.”

Sunshine Coast councillor Joe Natoli at the park in Mooloolaba.

Sunshine Coast Council provided funding of $2 million and partnered with the federal government, which contributed $500,000 through its Local Roads and Community Infrastructure Program, to reconstruct the revetment wall and upgrade the park.

Federal Member for Fisher and father-of-four Andrew Wallace hailed the upgrade.

“Projects like this ensure that families can get outside and get active in a safe environment, and take advantage of all that Mooloolaba has to offer,” he said.

“Whether it’s Mooloolaba, Maleny, Mount Mellum or Moffat Beach, locals know that there’s no better place to raise a family, start a business, retire in comfort, or give back to the community.”

Do you have an opinion to share? Submit a Letter to the Editor at Sunshine Coast News via news@sunshinecoastnews.com.au. You must include your name and suburb.

Subscribe to SCN’s free daily news email

Hidden
This field is for validation purposes and should be left unchanged.
[scn_go_back_button] Return Home
Share